ISSN: 2319-7293
Akpeh V.A., Ezechukwu O.A., Ezennaya S.O. and Anierobi C.C
This paper discusses the deficiencies in the use of historical load demand in regression equations for load forecasting for an area supplied by a utility that has insufficient power generation. It also suggests ways to remedy these deficiencies. The power demand of Abakaliki capital territory of Ebonyi state of Nigeria was used in this paper.